Consulting and Management

Wala Energy Engineering Company also prepares feasibility reports for the construction of all types of industrial plants, as well as technical and economic reports to obtain financing from domestic and foreign banking resources.
Consulting and Management Projects
Row Project Title Client
1 Performing services for monitoring the consumption of financial resources in the construction project of Rudshur power plant (approved plan of Sanat va Ma'dan Bank) Amirkabir Power Generation Co
2 Performing services for monitoring the consumption of financial resources in the construction project of Siahpoush Wind power plant (approved plan of Tosseh va Tavon Bank) Arian MahBaad Power Generation Co
3 Performing services for monitoring the consumption of financial resources in the construction project of 500 MW Caspian Combined Cycle power plant (approved plan of Sanat va Ma'dan Bank) Mah Taab Caspian Co.
4 Performing services for monitoring the consumption of financial resources in the construction project of Bandar Abbass 200,000 cubic meters per day desalination plant (approved plan of Sanat va Ma'dan Bank) Sazehsazan Co.
5 Feasibility studies and determining the appropriate site for Qeshm 500 MW combined cycle power plant Gheshm Movalled Co.
6 Environmental assessment study to obtain Iran Environment Protection Organization (IEPO) approval for construction of the power plant Persian Steel Co.
7 Feasibility and site selection study for SALAFCHEGAN simple cycle power plant Tabdil Energy Paya Co.
8 Preparing a report on feasibility studies, preparing technical and commercial specifications, conducting technical and contractual negotiations, preparing a report on the financial model of the power plant, preparing and completing a contract for the guaranteed purchase of electricity, and measures related to the preparation of the Lordegan power plant site Energy Gostar Lordegan Co.
9 Feasibility study for extension of electrical installations in AZARBAYJAN province for utilizing the Islamic Development Bank (IDB). Azarbayjan Regional Electric Company (AREC)
10 Feasibility study for extension of electrical installations in ISFAHAN province for utilizing the Islamic Development Bank (IDB). Isfahan Regional Electric Company (EREC)
11 Preparation of technical and economic justification report for the issuance of transfer plans for the year 2012 Tehran Regional Electric Company (TREC)
12 Preparation of report on technical and economic justification of power transmission projects for issuing participation bonds Guilan Regional Electric Company (GREC)
13 Preparation of technical and economic justification report for the issuance of transfer plans for the year 2012 Gharb Regional Electric Company (GREC)
14 Preparation of technical and economic justification report for the issuance of transfer plans for the year 2012 Zanjan Regional Electric Company (ZREC)
15 Preparation of technical and economic justification report for the issuance of transfer plans for the year 2012 Guilan Regional Electric Company (GREC)
16 Preparing a report on the technical and economic justification for issuing the participation bonds of the 2011 transfer plan Sistan and Baloochestan Regional Electric Company (SBREC)
17 Performing services for monitoring the consumption of financial resources in the construction project of Siahpoush Wind power plant (approved plan of Sanat va Ma'dan Bank) Mahtaab Kahnooj Co.
18 Conducting feasibility studies for the construction of a 500 MW combined cycle power plant in Hormozgan 3 Khalij Fars Development Co. & Tehran jonoob Co.
19 Preparation of technical, financial and economic justification report and submission to the Bank of Industry and Mines to use the financial facilities of the National Development Fund for the construction of the steam section of the Urmia Combined Cycle Power Plant Tadbir Sazan Saramad Co.
20 Preparation of technical, financial and economic justification report and submission to the Bank of Industry and Mines to use the financial facilities of the National Development Fund for the construction of Pasargad Qeshm Combined Cycle Power Plant Gheshm Movalled Co.
21 Conducting feasibility studies to use the facilities of the Islamic Development Bank for 4 projects as follows:1. Substation 400/230/63 kV Varamin; 2. 400 kV Siah bisheh Switchgear; 3. Siah bisheh-Wardavard 400 kV line; 4. Karim Khan 230 kV XLPE cable Tehran Regional Electric Company (TREC)
22 Investigation of technical-economic feasibility studies, review of financial model, review of technical specifications of the investor and its finalization, preparation of contract for guaranteed purchase of electricity and participation in contract negotiations of Yazd 2 power plant Iran Power Development Company (IPDC)
23 Investigation of technical-economic feasibility studies, review of financial model, review of technical specifications of the investor and its finalization, preparation of contract for guaranteed purchase of electricity and participation in contract negotiations of Khorramabad power plant Iran Power Development Company (IPDC)
24 Investigation of technical-economic feasibility studies, review of financial model, review of technical specifications of the investor and its finalization, preparation of contract for guaranteed purchase of electricity and participation in contract negotiations of Zargan and Khorramshahr power plants Iran Power Development Company (IPDC)
25 Investigating feasibility studies, reviewing the financial model, reviewing the technical specifications of the investor and finalizing it, preparing a contract for guaranteed purchase of electricity and participating in the contract negotiations of Zanjan 1 and Genaveh power plants Iran Power Development Company (IPDC)
26 Investigation of technical-economic feasibility studies, review of financial model, review of technical specifications of the investor and its finalization, preparation of contract for guaranteed purchase of electricity and participation in contract negotiations of Torbat Heydariyeh power plant Iran Power Development Company (IPDC)
27 Engineering services and feasibility studies of Andimeshk 500 MW Combined Cycle Power Plant Rey Niroo Engineering Co.
28 Conducting feasibility studies for the development plan of a 500 MW Ray combined cycle power plant Iran Power Development Company (IPDC)
29 Carrying out location and feasibility studies of Salafchegan 500 MW combined cycle power plant Iran Power Development Company (IPDC)
30 Performing services for monitoring the consumption of financial resources in the construction project of Kish Island Desalination & power plant (approved plan of Sanat va Ma'dan Bank) Kish Water and power Development C0.
31 Performing engineering services related to preparing an economic financial justification report for obtaining a loan from the Islamic Development Bank for projects for the construction of power transmission facilities Sistan and Baloochestan Regional Electric Company (SBREC)
32 Carrying out location and feasibility studies of Andimeshk 500 MW combined cycle power plant Thermal Power Plants Holding Company
33 Conducting location and feasibility studies for the 500 MW Buin Zahra Combined Cycle Power Plant Thermal Power Plants Holding Company
34 Performing services for monitoring the consumption of financial resources in the construction project of Shahr bijar water power plant (approved plan of Tosseh va Tavon Bank) Mah Aab Green Energy Development Co.
35 Engineering Services Preparation of financial justification report, to use the financial facilities of domestic or foreign banks for the construction of power transmission lines Azarbayjan Regional Electric Company (AREC)
36 Performing engineering services related to preparing a financial justification report for using the financial facilities of domestic or foreign banks for the construction of power transmission substations Azarbayjan Regional Electric Company (AREC)
37 Performing engineering services related to preparing a report on technical and economic justification to be submitted to the Islamic Development Bank for 5 transfer and above distribution substations Sistan and Baloochestan Regional Electric Company (SBREC)