Completed Projects

Row Project Title Client Start Finish
1 Performing engineering services for the first phase of 2000 MW Rudshur gas power plant (open cycle) Arian Mah-Taab Gostar Co. 2004 2005
2 Tehran office engineering services and site supervision o of 2000 MW Rudshur gas power plant in Robat Karim (Saveh road), built by Siemens and its auxiliary equipment Arian Mah-Taab Gostar Co. 2005 2007
3 Performing consulting and engineering services in order to prepare an EPC contract until the stage of concluding a contract with a contractor for the construction of a 500 MW power plant that can be converted into a combined cycle in Khorramshahr. SABA Electrical and energy Industries Co. 2006 2006
4 Performing engineering services, preparing the commercial portion and technical specifications and negotiating with the EPC contractor of Mazandaran Combined Cycle Power Plant Mah Taab Caspian Co. 2007 2008
5 Performing Tehran office services, site supervision over construction, installation and commissioning of a 460 MW combined cycle power plant west of Mazandaran in Nowshahr, including a Class F gas turbine unit, steam turbine and generator made by Ansaldo company (Single Shaft) and auxiliary equipment It Mah Taab Caspian Co. 2015 continues
6 Engineering services of steam portion of Urmia power plant to become a combined cycle Tadbir Sazan Saramad Co. 2013 2015
7 Engineering services and workshop supervision related to construction of steam portion of Urmia 1410 MW combined cycle power plant Tadbir Sazan Saramad Co. 2015 continues
8 Providing project management services for the construction and operation of the Samangan 500 MW Combined Cycle Power Plant project, construction of a 230 kV substation and connection to energy delivery points of the national grid, construction of gas transmission line and gas pressure reduction station to supply natural gas fuel required Kermanian Combined Cycle Power Plant Company 2015 2018
9 Performing services for monitoring the consumption of financial resources in the construction project of Rudshur power plant (approved plan of Sanat va Ma'dan Bank) Amirkabir Power Generation Co 2015 continues
10 Performing services for monitoring the consumption of financial resources in the construction project of Siahpoush Wind power plant (approved plan of Tosseh va Tavon Bank) Arian MahBaad Power Generation Co 2016 2019
11 Performing services for monitoring the consumption of financial resources in the construction project of 500 MW Caspian Combined Cycle power plant (approved plan of Sanat va Ma'dan Bank) Mah Taab Caspian Co. 2017 continues
12 Performing services for monitoring the consumption of financial resources in the construction project of Bandar Abbass 200,000 cubic meters per day desalination plant (approved plan of Sanat va Ma'dan Bank) Sazehsazan Co. 2016 continues
13 Integrated services, design management and site supervision for Bandar Abbas desalination project with a capacity of 200,000 cubic meters per day Sazehsazan Co. 2017 continues
14 Performing engineering services, preparing the commercial and technical specifications and negotiating with the EPC contractor of Sarakhs 2 combined cycle power plant Shams sarakhs power Generation Co 2006 2007
15 Tehran office engineering services and design review of construction of 20 MW Sarakhs gas power plant Shams sarakhs power Generation Co 2007 2007
16 Performing Tehran office services, technical inspection of documents and supervision over construction , installation and commissioning of Shobad 500 MW combined cycle power plant located in Kahnooj city of Kerman province, including one combined cycle power block made by Mapna company and its auxiliary equipment Mahtaab Kahnooj Co. 2013 2017
17 Performing engineering services, preparing the commercial portion and technical specifications and negotiating and signing the contract of Kahnooj 500 MW Combined Cycle Power Plant with Mapna Company (EPC Contractor) Mahtaab Kahnooj Co. 2013 2017
18 Design, engineering services and project owner engineer and site supervision of fuel oil tank area of ​​Rudshour power plant Arian Mah-Taab Gostar Co. 2007 2008
19 Feasibility studies and determining the appropriate site for Qeshm 500 MW combined cycle power plant Gheshm Movalled Co. 2007 2008
20 Engineering and management services for the construction of Qeshm 500 MW Combined Cycle Power Plant Gheshm Movalled Co. 2008 2010
21 Engineering services and project management of Qeshm 500 MW combined cycle power plant Gheshm Movalled Co. 2011 2011
22 Project management services for construction of 63 MW Siahpoush wind power plant Arian MahBaad Power Generation Co 2016 2017
23 Engineering and consulting services and preparation of proposals and announcements on documents and plans and participation in meetings and technical and contractual negotiations and site supervision and surveying and geotechnical operations in water supply projects, fuel oil tanks, substation, design of phase 2 of Rudshor , Salco, Persian Gulf Special Zone, Saveh, Amirabad, Kahnooj and Mazandaran and Belarus, Syria and Iraq Arian Mah-Taab Gostar Co. 2006 2007
24 Substation studies, Site proposal and network studies of the Persian Gulf Special Zone Power Plant Complex and substation design Persian Gulf Mining and Metal Industries Special Zone Organization 2007 2007
25 Supervision ofmaintenance and operation and overhaul of Gilan and Lushan power plants Guilan Regional Electric Company (GREC) 2007 2010
26 Performing engineering services, preparing the commercial portion, technical specifications and negotiating with EPC contractor of 500 MW Malayer combined cycle power plant Arian Mah-Taab Gostar Co. 2007 2008
27 Environmental assessment study to obtain Iran Environment Protection Organization (IEPO) approval for construction of the power plant Persian Steel Co. 2007 2008
28 Performing engineering services, preparing the commercial portion, technical specifications and negotiating and signing a contract for a 500 MW Zavareh combined cycle power plant in Ardestan, Isfahan province, with Mapna Company (EPC contractor) Persian Steel Co. 2007 2011
29 Feasibility and site selection study for SALAFCHEGAN simple cycle power plant Tabdil Energy Paya Co. 2007 2007
30 Assessing the competence of suppliers of specialized goods in the transmission sector required by the country's electricity industry TAVANIR 2008 2009
31 Supervising the overhaul of Unit 21 of Gilan Power Plant Guilan Regional Electric Company (GREC) 2008 2008
32 Performing engineering services in order to prepare contracts and power purchase tables (PPA) and participate in meetings and contractual and technical negotiations of Amirabad 8 MW power plant (small scale generator) located in Amirabad special zone of Mazandaran Arian Mah-Taab Gostar Co. 2007 2008
33 Performing various engineering services and consultations such as preparing proposals and announcing opinions on maps and documents and participating in meetings and contractual and technical negotiations for Malayer, Mazandaran, Amirabad, Salko, Persian Gulf, Nowshahr, Rudshor power plants. Arian Mah-Taab Gostar Co. 2008 2008
34 Designing installation circuits for 63.230 kV substations of Lushan power plant and monitoring its implementation Guilan Regional Electric Company (GREC) 2009 2011
35 Preparing a report on feasibility studies, preparing technical and commercial specifications, conducting technical and contractual negotiations, preparing a report on the financial model of the power plant, preparing and completing a contract for the guaranteed purchase of electricity, and measures related to the preparation of the Lordegan power plant site Energy Gostar Lordegan Co. 2009 2011
36 Feasibility study for extension of electrical installations in AZARBAYJAN province for utilizing the Islamic Development Bank (IDB). Azarbayjan Regional Electric Company (AREC) 2009 2014
37 Feasibility study for extension of electrical installations in ISFAHAN province for utilizing the Islamic Development Bank (IDB). Isfahan Regional Electric Company (EREC) 2009 2012
38 Performing engineering and consulting services for Malayer, West Mazandaran and Amirabad, Salko, Persian Gulf, Nowshahr and Rudshour power plants Arian Mah-Taab Gostar Co. 2009 2009
39 Consulting and supervision services for overhaul of the steam unit of Lushan power plant Guilan Regional Electric Company (GREC) 2010 2011
40 Consulting and supervision services for overhaul of steam unit of 1170 MW combined cycle power plant in Gilan Guilan Regional Electric Company (GREC) 2010 2010
41 Supervising the overhaul of the No 12 gas unit of Lushan power plant Guilan Regional Electric Company (GREC) 2010 2010
42 Supervising the operation and periodic maintenance of Gilan and Lushan power plants Guilan Regional Electric Company (GREC) 2010 2011
43 Unlimited engineering services for BOO power plants in Amirabad, Mazandaran, Malayer, Persian Gulf, Rudshor, Nowshahr, gas engines, Buin Zahra, Gulogah, Iran Khodro, Shahid Rajaei Arian Mah-Taab Gostar Co. 2010 2010
44 Preparation of report on technical and economic justification of power transmission projects for issuing participation bonds Tehran Regional Electric Company (TREC) 2011 2011
45 Preparation of report on technical and economic justification of power transmission projects for issuing participation bonds Guilan Regional Electric Company (GREC) 2011 2011
46 Engineering services and preparation of tender documents for Qom 500 MW combined cycle power plant Rey Niroo Engineering Co. 2011 2012
47 engineering services and site supervision of 500 MW BOO Genaveh combined cycle power plant and gas pressure reducing station of the power plant Iran Power Development Company (IPDC) 2010 2016
48 Engineering and consulting services in the early stages of construction of Saveh 2 500 MW combined cycle power plant Sinaco Co. 2012 2012
49 Providing consulting services as owner engineer and site supervision of the construction project of 6-megawatt CHP power plant in Qom (simultaneous production of electricity and distilled water) Rey Niroo Engineering Co. 2012 2014
50 Engineering Services Preparation of a justification report for obtaining financial facilities from the Islamic Development Bank Isfahan Regional Electric Company (EREC 2012 2013
51 Preparing a report on the technical and economic justification for issuing the participation bonds of the 2012 transfer plan Gharb Regional Electric Company (GREC) 2012 2013
52 Preparing a report on the technical and economic justification for issuing the participation bonds of the 2012 transfer plan Zanjan Regional Electric Company (ZREC) 2012 2012
53 Preparing a report on the technical and economic justification for issuing the participation bonds of the 2012 transfer plan Guilan Regional Electric Company (GREC) 2012 2013
54 Preparing a report on the technical and economic justification for issuing the participation bonds of the 2011 transfer plan Sistan and Baloochestan Regional Electric Company (SBREC) 2012 2013
55 Providing consulting services for technical and contract negotiations with D.E.C China (E.P.C.F Contractor of Qom 500 MW Combined Cycle Power Plant) Rey Niroo Engineering Co. 2012 2014
56 Performing services for monitoring the consumption of financial resources in the construction project of Siahpoush Wind power plant (approved plan of Sanat va Ma'dan Bank) Mahtaab Kahnooj Co. 2012 2016
57 Conducting feasibility studies for the construction of a 500 MW combined cycle power plant in Hormozgan 3 Khalij Fars Development Co. & Tehran jonoob Co. 2013 2014
58 Rudshur Power Plant ECA Contract Management and Supervision Services Amirkabir Power Generation Co 2013 2014
59 Preparation of technical, financial and economic justification report and submission to the Bank of Industry and Mines to use the financial facilities of the National Development Fund for the construction of the steam section of the Urmia Combined Cycle Power Plant Tadbir Sazan Saramad Co. 2014 2015
60 Preparation of technical, financial and economic justification report and submission to the Bank of Industry and Mines to use the financial facilities of the National Development Fund for the construction of Pasargad Qeshm Combined Cycle Power Plant Gheshm Movalled Co. 2014 2015
61 Performing excellent supervision and workshop services for the construction of Genaveh B.O.O Combined Cycle Power Plant on behalf of the investor Iran Power Development Company (IPDC) 2014 2017
62 Consulting services for purchase and replacement of electromechanical to electronic relays of steam generator turbine units Lushan Power Generation Joint Stock Company 2016 2017
63 Conducting feasibility studies to use the facilities of the Islamic Development Bank for 4 projects as follows:1. Substation 400/230/63 kV Varamin; 2. 400 kV Siah bisheh Switchgear; 3. Siah bisheh-Wardavard 400 kV line; 4. Karim Khan 230 kV XLPE cable Tehran Regional Electric Company (TREC) 2005 2006
64 Preparation of energy conversion agreement and contract negotiations of Omidieh power plant Iran Power Development Company (IPDC) 2007 2008
65 Preparation of energy conversion agreement and contract negotiations for Khomein power plant Iran Power Development Company (IPDC) 2007 2009
66 Preparation of energy conversion agreement and contract negotiations of Khuzestan power plant Iran Power Development Company (IPDC) 2007 2008
67 Performing engineering services to prepare a contract for the sale of electricity and related tables and to participate in meetings and contractual and technical negotiations for the sale of electricity to the Persian Gulf Special Zone Arian Mah-Taab Gostar Co. 2007 2008
68 Performing engineering and consulting services and technical and financial evaluation Bazofte Kish Co. 2007 2008
69 Provide all the information needed to conclude a guaranteed electricity purchase contract. Participate in meetings and review the EPC contract submitted by Unit International Co. Investigation of technical-economic feasibility studies, review of financial model, review of technical specifications of the investor and its finalization, preparation of contract for guaranteed purchase of electricity and participation in contract negotiations of Yazd 2 power plant Iran Power Development Company (IPDC) 2008 2011
70 review of technical-economic feasibility studies, review of financial model, review of technical specifications of the investor and its finalization, preparation of contract for guaranteed purchase of electricity and participation in contract negotiations of Khorramabad power plant Iran Power Development Company (IPDC) 2008 2010
71 Investigation of technical-economic feasibility studies, review of financial model, review of technical specifications of the investor and its finalization, preparation of contract for guaranteed purchase of electricity and participation in contract negotiations of Zargan and Khorramshahr power plants Iran Power Development Company (IPDC) 2008 2010
72 Investigating feasibility studies, reviewing the financial model, reviewing the technical specifications of the investor and finalizing it, preparing a contract for guaranteed purchase of electricity and participating in the contract negotiations of Zanjan 1 and Genaveh power plants Iran Power Development Company (IPDC) 2008 2011
73 Engineering and feasibility services of Lordegan 500 MW Combined Cycle Power Plant Bazofte Kish Co. 2008 2008
74 Issuance of construction license and preparation of financial and technical reports, review of technical specifications, preparation of energy sales contracts and participation in technical-contractual-commercial negotiations of Saveh private power plant Chelik Sanat Kaveh Co. 2009 2010
75 Engineering and consulting services such as reviewing and preparing technical documents and work inquiries in preparing a contract for guaranteed purchase of electricity and preparing a report on capital increase and participation in meetings and contractual and technical negotiations for Kahnooj 50 power plant Arian Mah-Taab Gostar Co. 2009 2009
76 Investigation of technical-economic feasibility studies, review of financial model, review of technical specifications of the investor and its finalization, preparation of contract for guaranteed purchase of electricity and participation in contract negotiations of Torbat Heydariyeh power plant Iran Power Development Company (IPDC) 2009 2011
77 Knowledge of manufacturers and sellers, technical studies, preparation of tender documents, contract negotiations and concluding contracts for mobile units Ghods Niroo Engineering 2009 2013
78 Engineering services of the process of preparing tender documents and selecting the EPC contractor and preparing the technical specifications and the EPC contract and participating in the contractual and technical meetings and negotiations of the South Ahvaz Combined Cycle Power Plant SABA Electrical and energy Industries Co. 2010 2012
79 Consulting services to review the guaranteed purchase contract of BOO South Fars power plant Iran Power Development Company (IPDC) 2010 2011
80 Consulting services to review the contract for guaranteed purchase of electricity from South Ahvaz power plant, Tehran, Saveh, Qazvin, Zargan Iran Power Development Company (IPDC) 2010 2012
81 Engineering services for the development of the Andimeshk 500 MW Combined Cycle Power Plant Jam sanaat karan Co. 2011 2012
82 Engineering services and preparation of tender documents for Andimeshk 500 MW Combined Cycle Power Plant Rey Niroo Engineering Co. 2011 2012
83 Engineering and consulting services regarding the implementation of FOG cooling system of Montazer Ghaem and Zahedan combined cycle power plants Iran Energy efficiency Organization 2011 2011
84 Consulting services for reviewing the guaranteed purchase contract of Hormozgan, Khorramshahr, Khorramabad and Andimeshk power plants Iran Power Development Company (IPDC) 2011 2012
85 Unlimited engineering services for Salko, Nowshahr, Persian Gulf and Rudshor power plants Arian Mah-Taab Gostar Co. 2011 2011
86 Performing services for monitoring the consumption of financial resources in the construction project of Siahpoush Wind power plant (approved plan of Sanat va Ma'dan Bank) Arian Mah-Taab Gostar Co. 2012 2015
87 HEKMAT small scale power plant Sinaco Co. 2012 2012
88 Providing engineering consulting services in order to purchase guaranteed electricity from a combined cycle power plant with a capacity of 230 MW in the Special Zone of Mining and Metal Industries of the Persian Gulf Iranian Mines and Mining Industries Development and Renovation Organization 2012 2013
89 Performing consulting services for owner engineer and site supervision of cooling system projects of Montazer Ghaem and Zahedan power plants Iran Energy efficiency Organization 2012 2013
90 Carrying out location and feasibility studies of Andimeshk 500 MW combined cycle power plant Rey Niroo Engineering Co. 2012 2012
91 Investigating the capacity and installation of resistors at the neutral point of 7 power transformers Ab o Bargh kish Co 2013 2014
92 Conducting feasibility studies for the development plan of a 500 MW Ray combined cycle power plant Iran Power Development Company (IPDC) 2015 2017
93 Carrying out location and feasibility studies of Salafchegan 500 MW combined cycle power plant Iran Power Development Company (IPDC) 2015 2019
94 Performing services for monitoring the consumption of financial resources in the construction project of Kish Island Desalination & power plant (approved plan of Sanat va Ma'dan Bank) Kish Water and power Development C0. 2015 2016
95 Performing consulting services to assess the qualifications of maintenance contractors of the power plants and to assess the qualifications of power plant operation and maintenance companies (maximum 120 companies) Thermal Power Plants Holding Company 2016 2018
96 Performing engineering services related to preparing an economic financial justification report for obtaining a loan from the Islamic Development Bank for projects for the construction of power transmission facilities Sistan and Baloochestan Regional Electric Company (SBREC) 2016 2018
97 Conducting network studies to determine how to connect Nasim wind power plant, including 6 wind turbine units, each turbine unit with a capacity of 4.3 MW and a total of 4.20 MW, located in the Siahpoush area of ​​Qazvin province to the national grid Energy nasim sazehsazan Co. 2016 2017
98 Carrying out location and feasibility studies of Andimeshk 500 MW combined cycle power plant Thermal Power Plants Holding Company 2016 2018
99 Conducting location and feasibility studies for the 500 MW Buin Zahra Combined Cycle Power Plant Thermal Power Plants Holding Company 2016 2018
100 Performing services for monitoring the consumption of financial resources in the construction project of Shahr bijar water power plant (approved plan of Tosseh va Tavon Bank) Mah Aab Green Energy Development Co. 2016 2019
101 Performing engineering services for Golestan power plant Taban Energy Pasargad Industries Development Company 2017 2018
102 Engineering Services Preparation of financial justification report, to use the financial facilities of domestic or foreign banks for the construction of power transmission lines Azarbayjan Regional Electric Company (AREC) 2017 2019
103 Performing engineering services related to preparing a financial justification report for using the financial facilities of domestic or foreign banks for the construction of power transmission substations Azarbayjan Regional Electric Company (AREC) 2017 2018
104 Performing engineering services related to preparing a report on technical and economic justification to be submitted to the Islamic Development Bank for 5 transfer and above distribution substations Sistan and Baloochestan Regional Electric Company (SBREC) 2017 2019
105 Engineering services, design review and site supervision of the 50 MW power plant in Amirabad port Arian Mah-Taab Gostar Co. 2010 2010